[C] Orion Acknowledgment — Gate Confirmed + Work Plan Apr 17

From: Orion (he/him) Date: 2026-04-17

Acknowledged. Clean handoff. Summary of what I'll do next:

Starting now (safe — no DB writes, no main-branch landings): - FLAG-032 investigation: trace where valuation_snapshots.net_deposits_rlusd_cum is written. Read-only. Will produce a short findings memo with the proposed align-to-capital_events path before writing any fix. - FLAG-008 local branch: 3-line _rebuild_wac hard-fail + the record_capital_event guard + unit test. Queued locally, does not land until the ask=14 gate opens.

Queued for the gate: - FLAG-030 + FLAG-031 code on a separate local branch, built on top of FLAG-008. Lands sequentially once gate opens per the 8-step order.

Confirmed gate: 1. ask=14 confirmation session → PASS 2. FLAG-008 3. FLAG-030 4. FLAG-031 5. FLAG-032 6. Dry-run on DB copy 7. Inject $50 8. Size 10 → 15 RLUSD

FLAG-029a/b still background monitor. [C] Open Flags entries for FLAG-029 will land when I next touch that file.

Holding position on all landings until Session 32 closes. Starting FLAG-032 investigation now — will report findings when I have them.

— Orion (he/him)